Introduction
- Webdrive Enterprise 2018 Build 18 0 600 Lbs Dollars
- Webdrive Enterprise 2018 Build 18 0 600 Lbs Thrust
- Webdrive Enterprise 2018 Build 18 0 600 Lbs Weight
![Webdrive Enterprise 2018 Build 18 0 600 Lbs Webdrive Enterprise 2018 Build 18 0 600 Lbs](https://diakov.net/uploads/posts/2019-01/1547745942_2019-01-17_202155.png)
[Click thumbnail to enlarge.]
Background
Approach and Main Assumptions of Analysis
Summary of Results
Conclusions
References
Tables
Table 1.Establishment Years | Full Production Years | |||||
Item | Unit | Year 1 | Year 2 | |||
Estimated Yield | lbs/acre | 0 | 7,841 | 31,218 | ||
Estimated Price | $/lb | 0 | 0.95 | 0.95 | ||
Total Receipts | Dollars | 0 | 7,449 | |||
Site Preparation Cost: | ||||||
Clear land Airport monitor utility 1 1 5 ubk download free. | 1,500 | |||||
Rock plow | 150 | |||||
Disk | 35 | |||||
Build mounds | 150 | |||||
Machinery transportation fee | 300 | |||||
Irrigation (material, labor) | 1,820 | |||||
Dig well | 300 | |||||
Guava plants (363 plants/acre, $4 per plant | 1,452 | |||||
Drill hole and plant | 908 | |||||
Total Site Preparation | $/acre | 5,115 | ||||
Pre-Harvest Variable Cost: | dollars | |||||
Irrigation | 47 | 47 | 47 | |||
Fertilizer | 337 | 354 | 354 | |||
Iron | 120 | 133 | 133 | |||
Herbicide | 207 | 212 | 212 | |||
Fungicide | 51 | 74 | 74 | |||
Insecticide | 49 | 17 | 17 | |||
Bags and nets | 26 | 237 | 1,047 | |||
Mowing | 120 | 120 | 120 | |||
Labor costs (pruning, fertilizing, etc.) | 953 | 2,225 | 3,997 | |||
Irrigation repairs | 0 | 20 | 40 | |||
All other repairs | 49 | 49 | 40 | |||
Interest on pre-harvest costs | 354 | 174 | 304 | |||
Total Pre-Harvest Variable Costs | $/acre | 2,312 | 174 | |||
Harvesting: | ||||||
Picking, packing, and transporting | 0 | 1,622 | 6,444 | |||
Boxes | 0 | 533 | 2,123 | |||
Total Variable Costs | $/acre | 7,427 | 5,817 | 14,960 | ||
Annual Cash Fixed Costs: | ||||||
Property tax | 74 | 76 | 78 | |||
Annual Non-Cash Fixed Costs: | ||||||
Land (rental price) | 525 | 525 | 525 | |||
Irrigation equipment | 108 | 108 | 108 | |||
Other machinery and equipment | 486 | 486 | 486 | |||
Amortized establishment cost | 737 | |||||
Total Fixed Costs | $/acre | 1,192 | 1,195 | 1,934 | ||
Accrued Interest on Establishment | 0 | 431 | -- | |||
TOTAL COSTS | $/acre | 8,619 | 7,442 | 16,893 | ||
NET RETURNS | $/acre | (8,619) | 6 | 12,764 | ||
Accumulated Establishment Costs | $/acre | 8,619 | 8,612 |
Item | Unit | Total |
Breakeven price | $/lb | $0.54 |
Breakeven yield | lb | 17,796 |
Yield (lbs/acre) | |||||
Price ($/lb) | 29,000 | 30,000 | 31,000 | 32,000 | 33,000 |
0.50 | (1,536) | (1,423) | (1,309) | (1,196) | (1,082) |
0.75 | 5,714 | 6,077 | 6,441 | 6,804 | 7,168 |
1.00 | 12,964 | 13,577 | 14,191 | 14,804 | 15,418 |
1.25 | 20,214 | 21,077 | 21,941 | 22,804 | 23,668 |
1.50 | 27,464 | 28,577 | 29,691 | 30,804 | 31,918 |
1.75 | 34,714 | Final cut pro 10 4 8 free download. 36,077 | 37,441 | 38,804 | 40,168 |
2.00 | 41,964 | 43,577 | 45,191 | 46,804 | 48,418 |
Investment Inputs | Purchase Price* | Useful Life | Interest Rate | Capital Recovery |
(dollars) | (years) | (percent) | ($/acre) | |
Tractor | 12,000 | 12 | 0.05 | 271 |
Boom sprayer | 4,000 | 10 | 0.05 | 104 |
Sit-on lawn mower | 1,500 | 10 | 0.05 | 39 |
Broadcaster spreader | 500 | 10 | 0.05 | 13 |
Golf cart | 2,000 | 10 | 0.05 | 52 |
50-gal sprayer | 200 | 10 | 0.05 | 5 |
5-gal backpack | 100 | 10 | 0.05 | 3 |
Irrigation pump | 5,600 | 15 | 0.05 | 108 |
Orchard establishment cost | 43,062 | 18 | 0.05 | 737 |
Total investment for 5-acre orchard | 68,962 | 1,330 | ||
*Excludes the cost of the land |
Footnotes
U.S. Department of Agriculture, UF/IFAS Extension Service, University of Florida, IFAS, Florida A & M University Cooperative Extension Program, and Boards of County Commissioners Cooperating. Nick T. Place, dean for UF/IFAS Extension.
Webdrive Enterprise 2018 Build 18 0 600 Lbs Dollars
Announcing WebDrive NextGen! The next generation of simple, powerful file access.
Windows
Supported Operating Systems
- Windows 10
- Windows 8
- Windows Server 2019
- Windows Server 2016 R2 editions
- Windows Server 2016, all editions
- Windows Server 2012-R2 editions
- Windows Server 2012, all editions
Minimum Hardware Requirements
- Pentium® class processor or better
- 4GB of RAM is required; 8GB of RAM is recommended
- Minimum 100MB of free disk space for product and cacheing
- Minimum SVGA (800x600) resolution
Webdrive Enterprise 2018 Build 18 0 600 Lbs Thrust
![Webdrive Enterprise 2018 Build 18 0 600 Lbs Webdrive Enterprise 2018 Build 18 0 600 Lbs](https://www.brdsc.com/images/spsimpleportfolio/enterprise11/scale20171117_131831_600x400.jpg)
Mac
Supported Operating Systems
- OS 10.15 Catalina
- OS 10.14 Mojave
Minimum Hardware Requirements
Webdrive Enterprise 2018 Build 18 0 600 Lbs Weight
- Disk Space: Minimum 100MB free disk space (for product and caching space)
- Other: WebDrive utilizes third party software as part of the product. The latest version of Fuse for Mac OS needs to be installed.